Mineral Reserves and Mineral Resources are as defined by the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves.
Mineral Resources are exclusive of Mineral Reserves.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
Factors that could materially affect the reported Mineral Resources or Mineral Reserves include: changes in metal price and exchange rate assumptions; changes in local interpretations of mineralization; changes to assumed metallurgical recoveries, mining dilution and recovery; and assumptions as to the continued ability to access the site, retain mineral and surface rights titles, maintain environmental and other regulatory permits, and maintain the social license to operate; Roxgold Sango obtaining Ministerial approval to include underground mining as a mining method and obtaining approval to update its Environmental and Social Impact Assessment permit to include underground mining at the Séguéla Mine; Boya SA obtaining an exploitation permit and an environmental impact assessment permit for the Diamba Sud Project.
Mineral Resources and Mineral Reserves are reported as of December 31, 2024, except Séguéla that is reported as of December 31, 2025 and Diamba Sud that is reported as of January 16, 2026.
Mineral Reserves for the Séguéla Mine are reported on a 100% ownership basis and estimated using incremental gold grade cut-offs for open pit mining of 0.73 g/t Au for Antenna and Koula, 0.74 g/t Au for Sunbird, 0.75 g/t Au for Boulder and Kingfisher, 0.76 g/t Au for Agouti, and 0.83 g/t Au for the Ancien and Badior deposits, and for underground mining of 2.14 g/t for Sunbird. These estimates are based on a gold price of $2,300/oz, metallurgical recovery rates of 93.5%, except for Badior at 91.5%, surface mining costs ranging from $3.09/t to $5.74/t based on the pit location relative to the run-of-mine pad, underground mining cost of $84.56/t, processing costs of $21.28/t, general and administrative (G&A) costs of $16.21/t. Only Proven and Probable Mineral Reserves within the final pit designs are reported. Antenna, Ancien, Koula, Badior and Kingfisher pits were designed with inter-ramp angles of 30.6° to 40.7° for oxide material, 40.7° to 42.9° for transitional material, and 59.6° for fresh material. Agouti and Boulder pits were designed with inter-ramp angles of 36.8° for oxide, 44.2° for transitional, and 60.0° for fresh material. Sunbird pit was designed with inter-ramp angles of 40.7° for oxide, 36.5° to 59.6° for transitional, and 52.2° to 61.2° for fresh material. For underground mining, a dilution factor of 0.5-meter skin has been applied on both the hanging wall and footwall for longhole stoping. The reported Mineral Reserves incorporate modifying factors for mining dilution and recovery through regularization of block models to an appropriate Selective Mining Unit (SMU) block size. Mineral Resources for the Séguéla Mine are reported at gold grade cut-offs of 0.65 g/t Au for Antenna, 0.66 g/t Au for Kestrel, Boulder, Sunbird, and Kingfisher; 0.68 g/t Au for Agouti; and 0.73 g/t Au for Ancien and Badior. These estimates are based on an assumed gold price of $2,600/oz and are constrained within preliminary pit shells honoring all geotechnical parameters. Underground Mineral Resources are reported within optimized stope shapes based on a longhole stoping mining method at cut-off grades of 1.89 g/t Au for Sunbird, 2.32 g/t Au for Koula and Kingfisher, and 2.41 g/t Au for Ancien. The Séguéla Mine is subject to a 10% free-carried interest held by the State of Côte d’Ivoire.
Mineral Reserves for the Lindero Mine are reported based on open pit mining within a designed pit shell based on variable gold cut-off grades and gold recoveries by metallurgical type: Met type 1 cut-off 0.26 g/t Au, recovery 75.4%; Met type 2 cut-off 0.25 g/t Au, recovery 78.2%; Met type 3 cut-off 0.25 g/t Au, recovery 78.5%; and Met type 4 cut-off 0.29 g/t Au, recovery 68.5%. Mining recovery is estimated to average 100% and mining dilution 0% having been accounted for during block regularization to 10m x 10m x 8m size. The cut-off grades and pit designs are considered appropriate for long term gold prices of $1,880/oz, estimated base mining costs of $1.39 per tonne of material, total processing and G&A costs of $10.28 per tonne of ore, and refinery costs net of pay factor of $13.44 per ounce gold. Reported Proven Reserves include 9.9 Mt averaging 0.41 g/t Au of stockpiled material. Mineral Resources are reported within a conceptual pit shell above a 0.23 g/t Au cut-off grade based on the same parameters used for Mineral Reserves and a 15% upside in metal prices. Mineral Resources for Arizaro are reported within a conceptual pit shell above a 0.23 g/t Au cut-off grade using the same gold price and costs as Lindero and an additional $0.52 per tonne of ore to account for haulage costs between the deposit and plant. A slope angle of 47° was used for defining the pit.
Mineral Reserves for the Caylloma Mine are reported above NSR breakeven cut-off values based on underground mining methods including; mechanized (breasting) at $ 91.85/t; mechanized (Uppers) at $ 73.33/t; semi-mechanized at $ 93.05/t; sub-level stoping at $82.77/t;and a conventional method at $153.40/t; using assumed metal prices of $23/oz Ag, $1,880/oz Au, $2,000/t Pb and $2,700/t Zn; metallurgical recovery rates of 82 or 86% for Ag, 22 or 58% for Au, 90 or 88% for Pb and 89 or 87% for Zn. Mining, processing and administrative costs used to determine NSR cut-off values were estimated based on actual operating costs incurred from July 2023 through June 2024. Mining recovery is estimated to average 95% with average total mining dilution of 17% depending on the mining method. Mineral Resources are reported at an NSR cut-off grade of $75/t for veins classified as wide (Animas, Animas NE, Nancy, San Cristobal) and $130/t for veins classified as narrow (all other veins) based on the same parameters used for Mineral Reserves, and a 15% upside in metal prices.
Mineral Resources for Diamba Sud are reported pit constrained on a 100% ownership basis at selective mining unit block sizes and at incremental gold cutoff grade for oxide/transitional material of 0.26 g/t Au, with fresh material reported based on a cutoff of 0.29 g/t Au for Area A, 0.37 g/t Au for Area D, 0.31 g/t Au for Karakara, 0.33 g/t Au for Western Splay, 0.28 g/t Au for Kassassoko, 0.31 g/t Au for Southern Arc, and 0.33 g/t Au for Moungoundi in accordance estimated average base mining costs of $4.57/t for all material mined, average processing and G&A costs of $21.45/t milled, and sales and transportation costs of $7.00/oz of gold. Pit slope angles applied are 33° for weathered material and 46° for fresh rock. The long-term gold price was $3,300/oz. Metallurgical recoveries are estimated using grade versus recovery relationship formulas developed for oxide/transition rock (all deposits) and separate formulas for fresh rock in each of the seven deposits A royalty of 3.5% has been considered in the generation of the pit shell and cut-off grade determination.
Eric Chapman, P. Geo. (EGBC #36328), is the Qualified Person responsible for Mineral Resources; Raul Espinoza (FAUSIMM (CP) #309581) is the Qualified Person responsible for Mineral Reserves; both being employees of Fortuna Mining Corp. (“Fortuna”).
Gold equivalent calculated using metal prices of $1,880/oz for Au, $23/oz for Ag, $2,000/t for Pb, and $2,700/t for Zn.
Totals may not add due to rounding procedures.